Cebula Hall at Saint Martin’s University

Project Cost

$5,700,000 or $225/SF

LEED 2009 Platinum

97 Points – highest scoring LEED building in the Western Hemisphere

Energy Use Index (EUI)

Predicted:   14.5 KBTU/SF

Actual:        11.8 KBTU/SF

Roles

LEED Management, design build services for HVAC, outdoor geothermal loop, energy management system (EMS), photovoltaics, and plumbing design.

Facility Description

Three story 25,310 square-foot educational facility for the College of Engineering.

Project Highlights

  • Geothermal HP system
  • 90+ % Effective Air to Air heat recovery system.
  • State of the air Energy Management System (EMS)
  • Photovoltaic array producing 20KWH Annually
  • 73% energy use reduction over ASHRAE baseline